WIP Aging Tracker
Track work-in-process jobs, see how long each job has sat in its current stage, spot late work and stages hoarding value. Runs entirely in your browser. No installation, no account, no upload.
Version 1.0.0 · Updated Aug 20, 2026
Use WIP Aging Tracker now
Runs in your browser · nothing is uploaded
This in-page version cannot save your work between visits — browser storage is switched off inside the sandbox. Download the free file to keep your data on your own computer.
Overview
Key benefits
- No installation and no account required
- Runs entirely in your browser
- Your data stays on your computer
- Print-friendly reports
How it works
- 1Download the HTML file
- 2Open it in your browser
- 3Enter your information
- 4Save the project file locally
Frequently asked questions
Is the WIP Aging Tracker really free?
Yes. The WIP Aging Tracker is a free download with every feature included — no trial period, no locked features and no account required.
Does my data stay private when I use the WIP Aging Tracker?
Yes. The tool is a single HTML file that runs entirely on your computer and makes no network requests, so nothing you enter is ever uploaded or shared.
Does the WIP Aging Tracker work offline?
Yes. Once downloaded it runs completely offline in any modern browser — no internet connection, installation or plugins needed.
Do I need Excel or any other software to use the WIP Aging Tracker?
No. It replaces the spreadsheet template entirely: open the file in your browser (Chrome, Edge, Firefox or Safari) on Windows, Mac, Linux or a tablet, and start working.
How to use WIP Aging Tracker
The complete in-tool guidance, reproduced here so you can read it before you download.
What this tool does
CM8-08 tracks work-in-process jobs and — more importantly — how long each job has been sitting in its current stage. Total job age tells you a job is old; days-in-stage tells you where it is stuck right now. That is the number that finds the bottleneck.
Everything runs inside this single HTML file. No installation, no account, no network requests — your customers, values and schedules never leave your computer.
Daily workflow
- Add jobs as work orders are released: WO number, value, current stage, due date.
- Move jobs with the “Move to…” selector on the WIP board whenever a job changes stage. The stage clock restarts and the movement is written to the log with the days it spent.
- Walk the board each morning sorted by Days in stage (the default). The jobs at the top are the ones nobody is talking about.
- Check the Aging Summary weekly: bucket drift to the right and value piling into one stage are your early warnings.
- Print the report for the production meeting — it contains the buckets, the stage summary and the late-jobs list.
How aging is computed
days in stage = as-of date − date entered current stage total age = as-of date − job start date days to due = promised date − as-of date (negative = LATE)
- All three are whole calendar days, relative to the as-of date in the toolbar (defaults to today).
- A job entered into a stage today shows 0d — it has not aged yet.
- Days-in-stage over 7 is shown amber, over 14 red. Late jobs carry a LATE n d pill and a tinted row — lateness is always shown as text, never colour alone.
Reading the aging buckets
- Bucket — Typical meaning in a job shop
- 0–3 d — Normal flow. Most WIP should live here.
- 4–7 d — Acceptable for long operations; worth a glance.
- 8–14 d — Stalled. Someone should be able to say why.
- 15–30 d — Stuck. Usually waiting on material, a decision or a customer.
- 30+ d — Dead inventory wearing a WIP badge. Escalate or close it out.
Watch value, not just count. Ten small jobs at 2 days matter less than one $40,000 job at 20 days. The bucket bars are scaled by value for exactly this reason.
Stage discipline
- Move jobs when they move. The tracker is only as honest as the last stage change. A 30-second update at shift end keeps the clocks true.
- Keep waiting states separate. “Await Material” and “Await Decision” exist so that idle time is charged to the real cause, not to Machining.
- Hoarding flag: a stage holding % or more of total WIP value is flagged with a warning in the stage summary — that is where your cash is parked.
- Editing the list: rename stages freely (existing jobs follow the rename), reorder with the arrows, and remove a stage once no jobs remain in it.
The “as of” date
All aging is computed relative to the as-of date in the toolbar. Leave it on today for live use. Set it backwards to reconstruct last Friday's picture for a report, or forwards to see what will breach its due date by the end of next week. Stage moves restamp the job with the as-of date, so keep it on today when doing normal updates.
Saving your work
- Autosave: the full board, stage list and movement log are kept in this browser's local storage automatically (see the timestamp in the toolbar) and restored when you reopen the file.
- Save: the Save button in the top toolbar writes to this browser's local storage straight away and flashes Saved ✓ HH:MM — use it before closing the tab if you want to be certain. It is local only; it does not produce a file.
- Report header: the title, company, prepared-by and closing-notes fields under the WIP board print onto the report header and footer, and are saved with the project.
- Save project (.json): a complete portable snapshot — jobs, stages, log, filters and the as-of date. Load it on any machine with this file.
- Export CSV: the job list with all aging columns, honouring the current filter and sort — ready for a spreadsheet or ERP import.
- Print: a one-page aging report (buckets, stage summary, late jobs). The browser's “save as PDF” works too.
- Reset all data clears everything after a confirmation.
Disclaimer
Verify important calculations independently. Tools are provided for informational and planning purposes and do not replace professional engineering, accounting, legal, tax or safety advice.
Where this fits
Part of WIP, Flow & Aging in Manufacturing & Production.
Related tools
Map a value stream step by step — process and wait times, value-add analysis, process-cycle efficiency, the biggest queues, and a current-versus-future-state comparison with a printable lean report. Nothing is uploaded.
5S Audit
Run a 5S workplace audit — score Sort, Set in order, Shine, Standardise and Sustain checkpoint by checkpoint from 0 to 4, track the audit score over time, and turn every low score into a corrective action with an owner and a date. Nothing is uploaded.
Structure your gemba walks — record observations by area and theme, keep the coaching questions and follow-ups honest, watch your walk cadence and close the loop with the team. Nothing is uploaded.
Capture every improvement opportunity found on the floor, size it, triage it by benefit against effort, and see honestly how many ever turn into a verified saving. Runs entirely in your browser. Nothing is uploaded.
Sequence jobs on your work centres with planned dates, hours and priorities, catch late-running work before the promise breaks, and measure schedule adherence and estimating accuracy on every completed job. Nothing is uploaded.
Record what the outgoing shift tells the incoming one — safety conditions, production status, quality holds, equipment faults, shortages and actions — with acknowledgement tracking and a printable handover sheet. This is the handover log, not a rota or roster. Nothing is uploaded.