CM8-08
WIP Aging Tracker
C
apsuleM8
· runs locally · nothing uploaded
Data
Save
Export .json
Import .json
Print Report
Reset
Jobs
0
Aging Summary
Movement Log
0
Help
Aging as of
Today
Job entry
Add a work order to the WIP board — fields marked * are required
Editing job
Cancel edit
Job / WO number *
Customer
Part / description
Priority
Quantity
Job value ($)
Order value or cost-to-date — used for bucket and stage value totals
Current stage *
Entered stage on *
Job start date
Drives total age
Promised / due date
Negative days-to-due = late
Notes
+ Add job
Reset inputs
WIP board
Oldest-in-stage float to the top by default
Stage
Priority
Late only
Sort by
Days in stage (oldest first)
Days to due (most late first)
Value (highest first)
Priority (Rush first)
WO number (A–Z)
Job
Qty
Value
Priority
Stage
In stage
Total age
Due
Move to
Actions
Report title
Company / site
Prepared by
Closing notes (printed)
Export CSV
Save project (.json)
Load project
Print aging report
Reset all data
WIP snapshot
Jobs in WIP
0
Total WIP value
$0
Late jobs
0
Late value
$0
Aging buckets — days in current stage
Where jobs are sitting. Long tails to the right mean stuck work.
Days in stage
Jobs
Value
Value share
No jobs yet — add work orders on the Jobs tab.
Executive visuals
Live charts — value and count always labelled in text, never colour alone. Included in the print report.
Aging buckets — value and job count
Value by stage — hoarding stages flagged
Late-job severity — days late, worst first
Stage summary
Jobs and value per stage — flags stages hoarding value
Stage
Jobs
Value
Oldest
Value share
No jobs yet.
Stage list
Rename, reorder, add or remove stages. Renames update existing jobs.
Add stage
Restore default stages
Movement log
Every stage change, newest first. Saved with the project.
Clear log
When
Job
From
To
Days in prior stage
No movements recorded yet. Use the “Move to” selector on the WIP board.