Tool Catalogue
Finished business tools that open directly in your browser — no installation, no account.
3 tools
Manufacturing & Production
Work out takt time from your available production time and customer demand, then time each process step with a stopwatch and see which steps run over takt, which ones are too variable to standardise, and where the bottleneck really is. Type the readings in or import a spreadsheet. Nothing is uploade
Manufacturing & Production
Write standard work properly: every work element, its manual, machine and walk time, the sequence, the standard WIP, and the operator balance against takt — with machine time kept parallel instead of wrongly added. Nothing is uploaded.
Manufacturing & Production
Assign work elements to stations, compare every station against takt and draw the Yamazumi stacked-time chart — line efficiency, the bottleneck station and the elements that can move, in one working register. Nothing is uploaded.