Lean Waste & Improvement
Walk the floor looking for the eight wastes, and log what you find.
Manufacturing & Production
Walk the floor, log the seven wastes plus underused talent, put a defensible annual cost on each observation, and print a ranked waste register that shows where the money leaks. Nothing is uploaded.
Manufacturing & Production
Structure your gemba walks — record observations by area and theme, keep the coaching questions and follow-ups honest, watch your walk cadence and close the loop with the team. Nothing is uploaded.
Manufacturing & Production
Capture every improvement opportunity found on the floor, size it, triage it by benefit against effort, and see honestly how many ever turn into a verified saving. Runs entirely in your browser. Nothing is uploaded.
Not built yet
The rest of this workflow, in the order we think it is worth building. If you need one of these, say so — requests decide the order.
- Waste Cost Calculator
- Motion & Travel Distance Study