WCapsuleM8

Lean Flow & Standard Work

Set the pace of the line and balance the work across the people on it.

Manufacturing & Production

Work out takt time from your available production time and customer demand, then time each process step with a stopwatch and see which steps run over takt, which ones are too variable to standardise, and where the bottleneck really is. Type the readings in or import a spreadsheet. Nothing is uploade

Download Runs in browserView

Manufacturing & Production

Write standard work properly: every work element, its manual, machine and walk time, the sequence, the standard WIP, and the operator balance against takt — with machine time kept parallel instead of wrongly added. Nothing is uploaded.

Download Runs in browserView

Manufacturing & Production

Assign work elements to stations, compare every station against takt and draw the Yamazumi stacked-time chart — line efficiency, the bottleneck station and the elements that can move, in one working register. Nothing is uploaded.

Download Runs in browserView

Not built yet

The rest of this workflow, in the order we think it is worth building. If you need one of these, say so — requests decide the order.

  • Standard Work Combination Sheet
  • Operator Balance Chart
  • Pitch & Pacemaker Calculator
  • Heijunka Load Leveling Board