CM8-06

Manpower Planner

CapsuleM8 · runs locally · nothing uploaded

Role definition

Describe the position, its coverage pattern and its workforce supply
Demand — how the requirement is set
People needed on the floor each shift
Supply — the workforce you have
%
Vacation + sick + other leave
%
Training, meetings, 5S, admin
%
Max OT as % of base hours
Cost
/h
Wage + benefits + statutory costs. 0 hides cost lines.
h/wk
Hours per shift × days per week

Role result

—
Required FTE
—
Gap
—
—
Utilization = required FTE ÷ effective available FTE. Over 100 % means the role is short.