CM8-314

Should-Cost & Programme Estimate

Pro CapsuleM8 · runs locally · nothing uploaded
DEMO Interactive preview with sample data — edit anything, nothing is saved. The full tool saves your work, imports and exports files, and prints reports.

Unit and programme position

Add a cost line

One line per material, operation, outsourced process or bought-in part

Filters

Applied to every screen, the report and the CSV

Routing and cost lines

No cost lines yet. Add one on the left, or load the sample model from the Settings tab to see a complete traction-drive assembly built up and taken to programme scale.