Capacity position
Add a routing operation
One row per product per work centre it visits — with that centre's shift patternFilters
Applied to every screen, the report and the CSVDemand & routing operations
No routing operations yet. Add one on the left, import a spreadsheet, or load the sample plan from the Settings tab.
Headline figures
Load vs capacity by work centre
Required hours as % of available hours, highest firstHours: used, spare and short
Per work centre, hours per weekWhat loads the bottleneck
Hours per week each product takes on the most-loaded centreWhere the hours go
Required hours per week by product, all work centresWork-centre load vs capacity
Available hours from the centre's first row; required hours from every operation on itDemand, standard hours and feasible output by product
Max feasible output scales the whole mix until the bottleneck reaches 100%Settings
Currency, dates and the rules this tool appliesReport header
Appears on the printed reportYour data
Stays on this computerRecords and settings are stored in this browser only. Use Export .json for a backup you can archive or move to another machine, and Import .json to restore it. Reset asks twice, then erases everything.