CM8-03

Production Capacity Planner

Capacity against demand, centre by centre — which work centre is the bottleneck and how many hours it is short.

Pro Flagship edition CapsuleM8 · runs locally · nothing uploaded
DEMO Interactive preview with sample data — edit anything, nothing is saved. The full tool saves your work, imports and exports files, and prints reports.

Capacity position

Add a routing operation

One row per product per work centre it visits — with that centre's shift pattern

Filters

Applied to every screen, the report and the CSV

Demand & routing operations

No routing operations yet. Add one on the left, import a spreadsheet, or load the sample plan from the Settings tab.